37
Start-up Checklist
Pre Start-Up
(Check each item as completed)
Verify all packaging material has been removed.
Verify the job site voltage agrees with the unit serial plate.
Check gas piping for leaks.
Check to ensure that all fans, pulleys and wheels are secure.
Check refrigerant piping for rubbing and leaks. Repair if necessary.
Check unit wiring to ensure it is not in contact with refrigerant piping or sharp metal edges.
Tighten as needed.
Verify that the crankcase heaters have been energized for 24 hours.
9/2014
Date: ___________________________________
Number: ___________________________________
Serial Number: ___________________________________
Technician: ___________________________________
__________________________________________
__________________________________________
Unit #: __________________________________________