EasyManua.ls Logo

Daikin EUWAN20KBZW1 - Expansion valve; Flow switch and pump interlock

Daikin EUWAN20KBZW1
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE11-02 Maintenance
Part 5 – Maintenance 5–5
3
5
1
5
Expansion valve The expansion valve will allow the correct amount of refrigerant to enter the evaporator to match the
cooling load (by keeping a constant superheat). Follow the instructions below to check the expansion
valve.
Check the superheat setting.
Inspect the bulb / power-head capillary connection (no chaffing).
Inspect the equaliser line visually.
Inspect the feeler bulb suction pipe connection / insulation.
Flow switch and
pump interlock
Follow the instructions below to check the flow switch and the pump interlock.
Check operation by ohmmeter after disconnecting the wires to the field terminals and simulating
flow and no-flow conditions.
Inspect the flow-switch for possible corrosion (glycol applications). Check electrical connections for
shunts or bridges.

Table of Contents

Related product manuals