EasyManua.ls Logo

Daikin FTKS35CVMB9 - Removal of Sound Insulation and Reactor

Daikin FTKS35CVMB9
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Si12-411A Outdoor Unit (80 / 90 Class)
Removal Procedure 235
1.7 Removal of Sound Insulation and Reactor
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1
Release the clip fixing
the compressor lead
wire.
2
Remove 2 screws of
the partition board, and
move the board
leftward.
The partition board is not
removable as it is fixed with
the fitting screw in the rear
bottom.
3
Remove the noise
insulation (outer).
Carefully remove the noise
insulation, which is easily
torn in the piping section.

Table of Contents

Other manuals for Daikin FTKS35CVMB9

Related product manuals