EasyManua.ls Logo

Daikin FTYS20BVMB - Outdoor Unit; Removal of External Casing

Daikin FTYS20BVMB
201 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Unit SiBE04-302
152 Removal Procedure
2. Outdoor Unit
2.1 Removal of External Casing
Procedure Warning Be sure to turn off all power supplies at least 10 min. before
disassembling work.
Step Procedure Points
1
The stop valve cover
can be removed when
the fixed screw is
removed.
As three hooks are provided,
slide the cover downward to
remove.
The forced cooling operation
in the pumping down mode
can be carried out by
pushing the operation switch
on the main unit for five
seconds. (The existing
models can do it through the
switch on the PC board just
as well.)
The layout of the connection
ports for the flares has been
changed to horizontal
position from vertical
position.

Table of Contents

Other manuals for Daikin FTYS20BVMB

Related product manuals