Do you have a question about the Daikin WSC113 and is the answer not in the manual?
Instructions for inspecting the unit for damage and handling procedures during receipt.
Requirements for unit mounting and necessary clearances for service and operation.
Specifies temperature and operating limits for the equipment room and system.
Describes placement of vibration pads and emphasizes adequate structural support for the unit.
Presents physical data, dimensions, and weights for various evaporator codes.
Provides physical data for condensers and explains the pumpdown feature for service.
Tabulates operating and shipping weights for single compressor WSC units.
Tabulates operating and shipping weights for dual compressor WDC/WCC units.
Explains relief valve function, types, and provides data on locations and settings.
Covers general maintenance of the electrical system, including contacts and connections.
Instructions for installing the motor terminal box on high-voltage units.
Explains how power leads are brought into the terminal box and connected.
Explains field wiring between terminal box and control panel.
Discusses chiller interconnection via pLAN and clarifies wiring responsibilities.
Details wiring procedures for connecting chillers via the pLAN network.
Explains how multiple chillers stage and load based on pLAN network control.
Warns about potential damage when switching between grid and auxiliary power sources.
Introduces the Daikin MicroTech II control system and its components.
Describes the hydraulic system and solenoid valves for vane movement.
Details lubrication system function, lubricant types, and maintenance requirements.
Emphasizes proper lubrication servicing and the importance of oil analysis.
Covers safety checks and procedures required for annual unit startup.
Step-by-step instructions for charging the refrigerant system.
Explains the importance and interpretation of oil analysis for chiller condition.
Details maintenance for compressor, motor, and lubrication systems.