Do you have a question about the Daikin WSC126 and is the answer not in the manual?
Guidelines for inspecting and moving the chiller upon receipt.
Proper placement and support requirements for chiller installation.
Provides data and connection details for the oil cooler system.
Details on relief valve function, types, and data.
Instructions for connecting power leads to the unit.
Procedures for insulating motor terminals on high voltage units.
Procedure for mounting the terminal box on high voltage motors.
Steps for insulating motor terminals using specific tapes and coatings.
Connecting chillers via pLAN for communication and control.
Setting operational order and defining installation roles.
Settings for compressor limits, capacity, and WCC models.
How chillers stage and load together in a networked system.
Overview of the chiller startup and commissioning process.
How inlet vanes control capacity and how to adjust vane speed.
How the lubrication system provides oil for bearings and vane control.
Steps for servicing the lubrication system, including oil checks.
Maintaining the refrigerant cycle, oil, and charge.
Steps for preparing the chiller for seasonal shutdown.
Procedures for safely restarting the chiller after shutdown.
Steps for replacing faulty pressure relief valves.
Interpreting wear metal, moisture, and TAN data from oil samples.