Specifies requirements for mounting the chiller unit, including base, clearance, and indoor installation.
Lists environmental and operational limits for chiller equipment, including temperature and standby conditions.
Explains how to operate chillers at low condenser water temperatures to improve performance, with equations.
Covers pump selection, vessel drains, piping connections, materials, and welding precautions.
Explains the function and installation of water flow switches for safety and operational interlocks.
Illustrates insulation requirements for cooling-only units, showing areas to insulate and not insulate.
Explains oil cooler function, connections, and piping for water-cooled oil coolers.
Covers electrical system requirements, wiring, voltage unbalance, and NEMA specifications.
Details power wiring, phase sequence, and insulation procedures for high-voltage motors.
Step-by-step guide for installing the motor terminal box on 10/11kV units, emphasizing care.
Provides procedures for insulating motor terminals using foam, tape, and shrink tubing.
Details how power leads are brought into and connected within the terminal box.
Explains interconnecting multiple chillers via pLAN network for coordinated operation.
Describes OITS settings for compressor operation, including max compressors and sequence.
Explains how MicroTech II manages staging and loading for multiple chillers.
A checklist for system readiness before chiller start-up, covering water, electrical, and miscellaneous items.
Explains how inlet vanes control compressor capacity via oil flow.
Provides steps for charging the refrigerant system after repairs and evacuation.
Presents a schedule of maintenance tasks by frequency (daily, weekly, monthly, etc.).