EasyManuals Logo

Danfoss T-420 User Manual

Danfoss T-420
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
6 Danfoss T-420 Crimp machine operator´s manual December 2022
Check out procedures
CAUTION: Throughout the Check-out Procedure check hose
assembly/adapter connections for any leaks. TIGHTEN if necessary.
CHECK oil level in power unit. The oil reservoir was lled at the factory; however,
if oil is required use ISO 32 (SAE 10W) hydraulic oil or equivalent.
1. Remove pipe plug from uid ll port on top of
reservoir and replace with plastic breather cap.
2. Plug power cord into 220 volt, 60 cycle, single phase
outlet. It is recommended that the pump be on an
individual 15 amp fused electrical circuit. If using
T-421U-110 pump, plug power cord into 110 volt,
60 cycle, single phase outlet. It is recommended that
the pump be on an individual 30 amp fused electrical
circuit.
3. Pull activating lever down. Pusher halves will close.
Continue to pull activating lever down until pump is
activated. Hold down until pump bypasses.
4. Release activating lever. Pump will stop and pusher
will retract.
5. Repeat Steps 3 and 4 approximately six times.
This will purge the hydraulic system.
Check-out using electric pump
(T-421U or T-421U-110)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Danfoss T-420 and is the answer not in the manual?

Danfoss T-420 Specifications

General IconGeneral
BrandDanfoss
ModelT-420
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals