EasyManua.ls Logo

DCS DCS-DRH48N - Page 8

DCS DCS-DRH48N
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CLEARANCES
7
0
0
INSTALLATION (MINIMUM CLEARANCES TO NON-COMBUSTIBLE MATERIAL).
FLOOR
96"
Four Bolts
Per Bracket
SIDE VIEW
Surface
Non Combustible
1/2" Conduit
(installer supplied)
Gas Shut-off
Valve
(installer supplied)
Gas Pipe
(installer supplied)
Utilize 2
bolts (min)
per bracket.
Drip Leg
min.
Make sure heater is level
(see warning on page 9)
0
0
& 30
0
INSTALLATION (MINIMUM CLEARANCES TO COMBUSTIBLE MATERIAL).
48"
18"
min
min
18"
Front View
Wall
(Combustible
Surface)
Wall
(Combustible
Surface)
Heater Mounting
Body Assy.