RUNNER 31
EXTRAORDINARY MAINTENANCE SCHEDULE
Object of maintenance
Action every
200h/2 months
Action every
500h/6 months
Action every
1.000h/1 year
Scrubber
-
drier
General
inspection
Traction unit
reduction
gear
Change after the
first 150h
Check level
Change
Traction unit thrust
bearing
Check play and
sliding
Brushes
Check coupling
system
Check the
condition
Replace
Squeegee
Check for wear
Cleaning,
checking and
adjustment
Electric traction motor
Brushes motors
Suction motors
Checking
“carbon”
brushes
Checking the
condition:
dismantling and
cleaning
Check electric
wiring
Replace
“carbon”
brushes
Driving
wheel
Check tightening
torque of screws
Rear wheels
Check tightening
torque of screws
Service brake
shoe
s
Check thickness
of friction
material (Must not
be less than 1mm )
Electromechanical
parking brake
Clean and adjust
Bolted connections
Check tightening
( see Table on
page 26 )
Steering chain
Greasing
(
s
ee
Table on page 26)
Clean and dirty
solution tanks
Check for leaks, if
any

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the DEC RUNNER and is the answer not in the manual?

DEC RUNNER Specifications

General IconGeneral
BrandDEC
ModelRUNNER
CategoryScrubber
LanguageEnglish