EasyManua.ls Logo

Deka Unigy II - User Manual

Deka Unigy II
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
NB Module
Installation and Operation Manual
California
Proposition 65
Warning:
Batteries, battery posts, terminals and related accessories
contain lead and lead compounds, and other chemicals known
to the state of California to cause cancer and birth defects or
other reproductive harm. Wash hands after handling.
®
Question and Answer IconNeed help?

Do you have a question about the Deka Unigy II and is the answer not in the manual?

Summary

Safety Precautions

Protective Equipment

Minimum safety equipment required for safe handling of batteries.

Procedures

Safety procedures to follow during battery installation processes.

Installation

Grounding

Proper techniques and standards for grounding battery systems.

Hardware Torque Requirements

Specified torque values for various hardware components during installation.

System Installations

Module Installation

Step-by-step instructions for installing battery modules.

Retainer Bar Installation

Instructions for installing retainer bars between module tiers.

Cell; Sleeve Installation

Process for installing individual cells into modules.

Electrical Connection

Terminal Assembly

Side Termination

Connector Assembly

Final Assembly Check Procedure

Steps to verify correct assembly, connections, and torquing.

System Operations

Charger Voltage

Settings for continuous float charging of batteries.

Record Keeping

Voltages, Temperatures & Ohmic Readings

Recording key battery maintenance parameters.

Maintenance

Annual Inspection

Procedures for yearly inspection of the battery system.

Cell Removal Procedure

Deka Unigy II Specifications

General IconGeneral
BrandDeka
ModelUnigy II
CategoryCamera Accessories
LanguageEnglish

Related product manuals