1-28 Rack Installation Guide
Figure 1-17. Rotating the Front Mounting Bracket for Flush-Mount Installation
6
Repeat steps 4 and 5 to configure the other slide assembly.
7
Holding the left slide assembly into position in the two-post rack at the location you marked,
adjust the extended back bracket tightly against the vertical two-post rack and secure it with
four 12-24 x 0.5-inch pan-head Phillips screws (see Figure 1-18).
8
Secure the front bracket on the slide assembly to the two-post rail with four 12-24 x 0.5- inch
pan-head Phillips screws (see Figure 1-18).
NOTE: Use all four screws to ensure that the bracket is securely attached to the rail.
9
Perform steps 7 and 8 to install the right slide assembly in the rack.
nut (2 per bracket)
mounting flange
shoulder washer (2 per bracket)
screws (2 per bracket)