What does it mean when my Deye Inverter has a grid failure?
- KKimberly PotterJul 26, 2025
A red LED blinking three times indicates a grid failure.
What does it mean when my Deye Inverter has a grid failure?
A red LED blinking three times indicates a grid failure.
Model | SUN800G3-EU-230 |
---|---|
Category | Inverter |
Max. DC Input Voltage | 60 V |
Number of MPPT Trackers | 2 |
Number of Inputs per MPPT | 2 |
Max. DC Input Current | 13 A |
Nominal AC Output Power | 800 W |
Nominal AC Voltage | 230 V |
Rated AC Frequency | 50/60Hz |
Power Factor | >0.99 |
Total Harmonic Distortion (THD) | <3% |
Max. Units per Branch | 6 |
Protection Degree | IP65 |
Cooling | Natural Convection |
AC Voltage Range | 180V-280V |
Operating Temperature Range | -25°C to 60°C |
Communication | Wi-Fi / RS485 |
General safety guidelines, electrical installation, handling, and connection procedures.
General installation process, avoiding RCDs, and surge protector recommendations.
Steps for installing the junction box and wiring the AC cable.
Instructions for marking locations and mounting the microinverter on the frame.
Steps for connecting microinverters in parallel and adhering to branch limits.
Steps for switching on AC circuit breakers to start power generation.
Describes LED indicators for different operating states and errors.
Methods to identify microinverter problems based on LED status or power readings.
Steps for diagnosing network issues and systematic troubleshooting of microinverters.
Step-by-step guide for safely disconnecting and replacing a microinverter.
Steps to connect to the logger network and access the configuration interface.
Instructions for using a browser to access the device's IP address and login.
Guide to selecting the correct wireless network and entering the password.
Checking system information after network activation and troubleshooting server connection issues.