7.2 Din rail installation
The first step is to check the grounding and
stability of the guide rail: the guide rail slot of
the switch is clamped into the guide rail; The
second step: from the center to both sides of
the guide rail positioning screws in order. Step
3: Use screws to fix the mounting rail card slot
on the fixed guide groove at both ends of the
guide rail to ensure that the guide rail and the
switch are fixed on the guide rail vertically and
stably.
7.3 grounding
Fix the grounding wire to the grounding screw
above the switch, and ensure good reliable
connection of the grounding system.
7.4 Power Connection
Insert the power cord into the specified position of the 6-core
terminal, and insert the terminal into the standard power supply inlet
(P+1 and P-1 input corresponding to the first power supply P1, and
P+2 and P-2 input corresponding to the second power supply P2).
The available voltage standard of the power supply is supported from
48V DC to 57V DC