EasyManuals Logo

Ditch Witch 1030 User Manual

Ditch Witch 1030
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
50 1030/1230 - LUBRICATION AND MAINTENANCE
LUBRICATION SCHEDULE
50 1030/1230 - LUBRICATION AND MAINTENANCE
LUBRICATION SCHEDULE
Engine Oil
Check
Check engine oil at dipstick (A)
before each operation. Add GEO
at fill neck (A) as necessary to
keep oil level at highest line on
dipstick.
Change
Change oil every 100 hours
with GEO.
Drain crankcase (B) while oil is
still warm.
Refill at fill neck with 2.3 pt
(1.1 L) of GEO.
Engine Oil
Check
Check engine oil at dipstick (A)
before each operation. Add GEO
at fill neck (A) as necessary to
keep oil level at highest line on
dipstick.
Change
Change oil every 100 hours
with GEO.
Drain crankcase (B) while oil is
still warm.
Refill at fill neck with 2.3 pt
(1.1 L) of GEO.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch 1030 and is the answer not in the manual?

Ditch Witch 1030 Specifications

General IconGeneral
FuelDiesel
TransmissionHydrostatic
Digging Depth48 in (121.9 cm)
Trenching Width6 inches
Drive System4WD

Related product manuals