JT920/JT920L - SETUP 77
UNLOAD
JT920/JT920L - SETUP 77
UNLOAD
SETUP
UNLOAD
1. Drive drilling unit off trailer, following directions in
TRANSPORTATION.
2. Review bore plan and select drilling unit position and remote
fluid unit position.
Position Drilling Unit and Frame
1. Start engine and move drilling unit to appropriate distance
from start of bore.
2. Tilt frame as needed to reach desired entry pitch.
3. Lower stabilizers until stabilizers begin to put pressure on
ground.
4. Continue lowering to increase entry pitch.
SETUP
UNLOAD
1. Drive drilling unit off trailer, following directions in
TRANSPORTATION.
2. Review bore plan and select drilling unit position and remote
fluid unit position.
Position Drilling Unit and Frame
1. Start engine and move drilling unit to appropriate distance
from start of bore.
2. Tilt frame as needed to reach desired entry pitch.
3. Lower stabilizers until stabilizers begin to put pressure on
ground.
4. Continue lowering to increase entry pitch.