EasyManua.ls Logo

Ditch Witch JT920L - Page 91

Ditch Witch JT920L
169 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JT920/JT920L - OPERATION 91
DRILL FIRST PIPE
JT920/JT920L - OPERATION 91
DRILL FIRST PIPE
Break Joint at Saver Sub
1. When joint flats are aligned with front wrench, release
joystick.
2. Engage front wrench.
3. Rotate spindle clockwise slowly until wrench flats engage
pipe flats.
4. Reverse rotation and slowly move carriage back as threads
unscrew.
IMPORTANT: Move carriage back only after threads have
unscrewed completely to protect threads.
5. Stop rotation and move carriage to back of frame.
Break Joint at Saver Sub
1. When joint flats are aligned with front wrench, release
joystick.
2. Engage front wrench.
3. Rotate spindle clockwise slowly until wrench flats engage
pipe flats.
4. Reverse rotation and slowly move carriage back as threads
unscrew.
IMPORTANT: Move carriage back only after threads have
unscrewed completely to protect threads.
5. Stop rotation and move carriage to back of frame.

Related product manuals