gpelectric.com | [page 11]
BST Time
Absorption
Duration
120min 0 - 600min
The absorption duration is the amount of
time the bulk-absorption voltage will be
applied to the battery during the absorption
stage.
Equ Int
Equalization
Interval
0days 0 - 250 Days
The equalize interval is the frequency at
which an equalize charge will be performed
to maintain the battery.
T Comp Temp Comp Factor -24mV/C 0 to -30mV/C
The temperature compensation factor is used
to adjust the charging current according to
the measured temperature of the battery to
ensure there is no damage to the battery.
This is not valid for Lithium batteries.
COMMANDS
Force CHG Not in App Normal
Normal, Main
Bulk, Main Flt, Alx
Bulk, Alx Flt
Force the controller into either bulk or oat
charge stage on either battery bank 1 or 2
Set Defualts
Reset to Factory
Default
N/A N/A Set all settings to default
Clear History Not in App N/A N/A Reset historical data
STATUS, SETTINGS AND COMMANDS