EasyManua.ls Logo

Dometic Penguin II - Foam Dividers for 6.0 to 7.5 in. Roof Thickness

Dometic Penguin II
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
EN
Installation Value Air Distribution Box (ADB), Mechanical
7.1.2 Roof Thickness 6.0-7.5 in.
(152to191mm)
All Models
Roof
Thickness
6.0in.
(152mm)
2
6.5in.
(165mm)
2
7.0in.
(178mm)
2
7.5in.
(191mm)
2
Total Divider
Thickness
7.0in.
(180mm)
7.5in.
(190mm)
7.9in.
(200mm)
8.3in.
(210mm)
Top Foam
0.4 in.
(10 mm)
x x x x
Top Foam
Ring
0.4 in.
(10 mm)
x x x x
Foam
Divider
0.4 in.
(10 mm)
x x x
Foam
Divider
0.4 in.
(10 mm)
x
Foam
Divider
1.2 in.
(30 mm)
x x
Foam
Divider
1.2 in.
(30 mm)
x x x x
Foam
Divider
1.2 in.
(30 mm)
x x x x
ADB Adaptor
1.2 in.
(30 mm)
x x x x
Spare
2
Foam
Divider
1.2 in.
(30 mm)
x x x x
Spare
2
Foam
Divider
1.2 in.
(30 mm)
x x x x
1
Up to 0.4 in. (10 mm) of compression of the foam dividers is acceptable and may be
required in some instances
2
To accommodate a roof thickness greater than 5.5 in. (140 mm), order the optional
accessory kit. See “Tools and Materials” on page4.
1. Using the tables, determine the number and
combination of foam dividers required based on the
roof thickness.
q
w
e
22 Confirming the Foam Divider Height Measurement
q
Flat Surface of the
ADB
e
Full Height
Measurement
(Equal to the Roof
Thickness)
w
Stack of Foam Dividers
2. Place the ADB face down on a stable, protected, flat
surface.
3. Stack the foam dividers required and place them onto
the ADB.
4. Measure the full height, from the flat surface of the
ADB to the top of the foam dividers to confirm the
full height is equal to the previously determined roof
thickness.
5. Adjust the number of foam dividers to reach the
correct full height, as necessary.

Related product manuals