EasyManuals Logo

DoorHan DS Series User Manual

DoorHan DS Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
9
Рис. 4a
3
Fig. 4a
1. Stretch the connection wiring through the tube.
2. Install the dock leveler in the required position.
3. Connect the dock leveller external frame with fittings of concrete floor by
welding. See Fig 3a.
4. Longitudinal gaps between the pit and leveler should be 10–15 mm width.
5. Underpour concrete.
INSTALLATION
Connect dock leveller steel
structure to the grounding of
the building!
Remove transportation bolts before use

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the DoorHan DS Series and is the answer not in the manual?

DoorHan DS Series Specifications

General IconGeneral
BrandDoorHan
ModelDS Series
CategoryLifting Systems
LanguageEnglish