9
Рис. 4a
3
Fig. 4a
1. Stretch the connection wiring through the tube.
2. Install the dock leveler in the required position.
3. Connect the dock leveller external frame with fittings of concrete floor by
welding. See Fig 3a.
4. Longitudinal gaps between the pit and leveler should be 10–15 mm width.
5. Underpour concrete.
INSTALLATION
Connect dock leveller steel
structure to the grounding of
the building!
Remove transportation bolts before use