P r ogram De scriptions: 5 . 3 0 Wa l k Test (Ins taller)
27
To perform a walk test:
Step 1 - Enter Installer Programming
Step 2 - Enter Section [901]
When any zone is violated the panel will activate the Bell Out-
put for two seconds, log the event to the event buffer and
communicate the alarm to central station.
Test each zone several times. Check the event buffer to
ensure that all zones and FAP keys are functioning properly.
NOTE: Zones with the Force Arm attribute enabled, will not
cause the Ready light to go out when they are violated.
To stop the test:
Step 1 - Enter Installer Programming
Step 2 - Enter section [901]
Check the event buffer after the walk test is complete, to
ensure that the Audible/Silent 24-hr PGM alarms have been
restored.
NOTE:The alarm memory is cleared upon entering Walk Test
mode. When the walk test is complete, the Alarm Memory light
will remain lit, but there will be no alarms in memory. The light
will turn off the next time the panel is armed.
Installer Walk Test Enable/Disable . . . . . . . . . . Section [901]