8 DU_M_P3 Comforts_16.04.01
Cut the drain throat from shower tray,
measurement X (step 12) plus 2 1/2“.
13
Apply mortar on the floor.
Place the shower tray in place. Check the leveling and install the drain.
Install the cover.
File down the cut edge of the drain throat.
14
16 17
15
18