EasyManua.ls Logo

DynAmp LKAT2 - Spare Parts

DynAmp LKAT2
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation, Operation and Service Manual LKAT
2
+24V
© 2018 DynAmp, LLC Page 30
046404 E
6.3 SPARE PARTS
The following table lists the minimum recommended quantities for spare parts for the LKAT
2
System. As spares are used, replacements should be ordered. Since continuous operation
of high-current measurement systems is often critical, stocking spare parts should be given
high priority.
Some cable assemblies for the LKAT
2
System include circular connectors. Others use solder
cup connectors assembled with adhesive-lined shrink tubing covering the connector shell. If
connector(s) are severed from the associated cable assembly, field installable replacement
connectors may be purchased. These connectors may also be installed after routing head
interconnection cables in conduit. Over-molded replacement cable assemblies may be
purchased for the power input and output cables. Head cable connector(s) must be replaced
by field installable type(s), or with a new head. Refer to Spare Parts List Table 6.1
The LKAT
2
System Measuring Heads require special repair procedures and materials.
However, the heads are very reliable and should require little or no repair over its service life.
Please refer to the nearest authorized DynAmp, LLC service center for information on repairs.
Table 6.1
Spare Parts List
DESCRIPTION ITEM NO. RECOMMENDED
QUANTITY
Angle, LKAT
2
Mounting 100mm
46039
8 (each)
Screw , LKAT
2
mounting SHCS 1/4-20 X 3”
46028
2 (each)
Spare System
Complete System
(Head & Metering Unit calibrated as system)
*
TBD
Metering Unit
**
TBD
Measuring Head
**
TBD
* Item number same as original system
** Contact DynAmp, LLC
.

Other manuals for DynAmp LKAT2

Related product manuals