EasyManua.ls Logo

Eaton 9910-E16 - UPS Placement

Eaton 9910-E16
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
EATON 9130 (9910-E15/E16) UPS Installation Guide for IBM
®
Applications S 164201783 Rev 2
8
Unpacking the Cabinet
C
A U T I O N
S Unpacking the cabinet in a low-temperature environment may cause condensation to
occur in and on the cabinet. Do not install the cabinet until the inside and outside of the
cabinet are absolutely dry (hazard of electric shock).
S The cabinet is heavy (19.0 kg/41.9 lb). Use caution to unpack and move the cabinet.
Use care when moving and opening the carton. Leave the components
packaged until ready to install.
To unpack the cabinet and accessories:
1. Open the outer carton and remove the accessories packaged with
the cabinet.
2. Carefully lift the cabinet out of the outer carton.
3. Discard or recycle the packaging in a responsible manner, or store it
for future use.
Place the cabinet in a protected area that has adequate airflow and is
free of humidity, flammable gas, and corrosion.
Installation
C
A U T I O N
The cabinet is heavy (19.0 kg/41.9 lb). Removing the cabinet from its carton requires a
minimum of two people.
To install the cabinet:
1. Place the UPS on a flat, stable surface in its final location.
2. If installing additional cabinets, place them next to the UPS in their
final location.
3. Continue to the following section, “Wiring Installation.”

Table of Contents

Related product manuals