EasyManua.ls Logo

Eaton 9E 20000i - Installation; Unpacking

Eaton 9E 20000i
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
3.Installation
3.1 Unpacking
1. Cut the straps
2. Open the carton, take off wood board, accessory pack and PE form.
3. Remove carton upward and take out front PE form.
4. Put the wood board (removed at step2) as figure showed. Make sure
that the slide rests firmly against the pallet so it remains in place during
unloading operations. Pull the UPS from the front with caution when
sliding it off the pallet.
NOTE: All parts of the packaging should be kept for future use.

Other manuals for Eaton 9E 20000i

Related product manuals