EasyManua.ls Logo

Eaton 9SX Series - Page 24

Eaton 9SX Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 24
614-20306-00 - 9SX 0-6 KVA EMEA_EN
3. Installation
D - Connecting the EBM
1. Plug the EBM power cable(s) into the battery connector(s). Up to 4 EBMs may be connected to the UPS.
2. Verify that the EBM connections are tight and that adequate bend radius and strain relief exist for each
cable.
3. Connect the battery detection cable(s) to the connector of the UPS and of the EBM(s).

Other manuals for Eaton 9SX Series

Related product manuals