Figure 15. Fanning strip installed into terminal board
13. Secure the CL-7 control panel to the latch tab using the
latching screw.
14. Complete the control programming and testing as
required. Refer to document MN225003EN, CL-7
Control Installation, Operation, and Maintenance
Instructions for proper control configuration and start
up procedures.
6
CL-7 Control Panel Retrofit
InstallatIon InstructIons MN225018EN April 2018

Other manuals for Eaton EZ II Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton EZ II Series and is the answer not in the manual?

Eaton EZ II Series Specifications

General IconGeneral
BrandEaton
ModelEZ II Series
CategoryCables and connectors
LanguageEnglish

Related product manuals