EasyManua.ls Logo

EAW KF760 - Page 24

EAW KF760
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01 Page 23 of 29
8. Push the palleted KF761 aside.
2.4.3 Second And Subsequent KF671s
1. The array should already be positioned at about 4 feet / 1.2 m or enough to allow the KF761 to swing
down on its rear hinges with its face parallel to the floor and above the level of its pallet.
2. Position an empty KF761 pallet under the array.
Not Shown:
3. Remove any hinge locking pins from the KF761 rear Hinge Tubes and put aside for loose storage.
4. While supporting the front of the KF761, remove the connecting pins from its front hinges. Put the
connecting pins back in the hole from which they were removed. Ease the front of the KF761 down so it
is hanging from the rear hinges.
All manuals and user guides at all-guides.com

Other manuals for EAW KF760

Related product manuals