EasyManua.ls Logo

EAW KF760 - Page 25

EAW KF760
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01
KF760 Series Rigging Procedures PRELIMINARY DRAFT -- 21 Aug 01 Page 24 of 29
5. While positioning the pallet, bump the array down so the face of the KF761 rests on its pallet with the
weight just off the chain motors.
6. Remove the rear pins connecting the KF761 to the enclosure above it.
7. Fly out the array to an appropriate working height for the next step. Retract the hinges into the
palleted KF761 Hinge Tubes.
All manuals and user guides at all-guides.com

Other manuals for EAW KF760

Related product manuals