EasyManua.ls Logo

EcoKing C100 - Page 3

Default Icon
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table of contents (continued)
Part 10 - Lighting the appliance / First start-up
Fill and refill of the CH section
General use of the control panel
Setting of user parameters
Weather dependent control
Set the comfort level
Set the maximum central heating temperature
Set the hot water comfort
Vent
Diagnosis menu
Read out measured values at user level
Read out measured values at installer level
Calibration
Manual Calibration
Automatic Calibration
Service operation
Part 11 - Installation check list
62
Installation
62
Start-up
62
Operational Checklist
62
Before Leaving
62
Instructions to Installing Contractor
62
Part 12
- Annual maintenance and inspection
63
Annual Inspection Checklist
63
Crystalline Silica
64
Refractory Ceramic Fibers (RFC)
65
Part 13
- Parts list
67
Part 14
Troubleshooting
69
Servicing the Appliance
69
Displaying faults
69
Fault history
69
Fault codes
70
Reset fault
70
Fault code list
71
Trouble shooting list
71
Possible causes and solutions
72
Part 15 Start Up Checklist
73
Part 16 Maintenance Checklist
74

Table of Contents

Related product manuals