EasyManua.ls Logo

EcoKing C100 - User Manual

Default Icon
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
EcoKing Supreme
high efficiency wall boiler
Installation Manual
2015
For Model numbers:
C100, C140, C200
H100, H140, H200
Installation
Service and maintenance
Start up
Parts
WARNING: If the information in this manual is
not followed exactly, a fire or explosion may
result causing property damage, personal injury
or loss of life.
WHAT TO DO IF YOU SMELL GAS:
Switch off the appliance.
Shut off the gas supply.
Open the windows.
Do not try to light any appliance.
Do not touch any electric switch.
Do not use any phone in your building.
Leave the house.
Immediately call your gas supplier from a
neighbour’s phone. Follow the gas
supplier's instructions.
If you cannot reach your gas supplier,
call the fire department.
WHAT TO DO IF YOU SMELL FLUE
GASSES:
Switch off the appliance.
Open the windows.
Shut off the gas supply.
Leave the house.
Contact a registered installer or
a registered service center.

Table of Contents

Questions and Answers

  • R
    rcastroAug 14, 2025
    What to do if the EcoKing C100 Boiler water pressure is too low?
    • J
      Justin McmillanAug 14, 2025
      If the water pressure in your EcoKing Boiler is too low, re-fill the installation.
  • M
    mistylopezAug 17, 2025
    What to do if EcoKing C100 Boiler shows lock-out no ignition?
    • M
      Melanie CarrilloAug 18, 2025
      If your EcoKing Boiler is in lock-out with no ignition, check the CH connections.
  • B
    Brenda HillAug 21, 2025
    What to do if EcoKing C100 Boiler shows lock-out Primary temperature too high (>95 ºC)?
    • A
      Austin KlineAug 21, 2025
      If your EcoKing Boiler is in lock-out because the primary temperature is too high (over 95 ºC), check parameter 2.
  • A
    Austin McdanielAug 25, 2025
    What to do if EcoKing Boiler shows lock-out ionization problem - parasitic flame?
    • J
      Joseph HowardAug 26, 2025
      If your EcoKing Boiler is in lock-out due to an ionization problem with a parasitic flame, check parameter 0.
  • M
    Michelle BranchAug 29, 2025
    What to do if EcoKing C100 Boiler shows lock-out high limit temperature protection?
    • W
      William GrayAug 29, 2025
      If your EcoKing Boiler is in lock-out due to high limit temperature protection, check parameter 1.
  • P
    ppayneSep 1, 2025
    What to do if EcoKing Boiler shows lock-out Flame lost for 6 times?
    • E
      Elizabeth StrongSep 1, 2025
      If your EcoKing Boiler is in lock-out because the flame was lost 6 times, check the speed in the diagnose menu (24) and check parameters 4 and 5.
  • F
    friedmanbryanSep 5, 2025
    What to do if EcoKing C100 Boiler shows DHW sensor fault?
    • J
      Julie MoonSep 5, 2025
      If there is a DHW sensor fault in your EcoKing Boiler, check the DHW temperature via the diagnose menu (8) and replace the sensor when required.
  • K
    Kayla LopezSep 9, 2025
    What to do if EcoKing Boiler shows flue gas blockage?
    • Z
      zperezSep 9, 2025
      If your EcoKing Boiler has a flue gas blockage, check the flue pipe for blockages.

Summary

Safety and Operation

For Your Safety, Read Before Operating

Critical safety instructions and warnings before appliance use.

Operating Instructions

Step-by-step guide for initial appliance startup and operation.

Turn Off Gas to Appliance

Procedure to safely shut off the gas supply to the appliance.

Specific Warnings

Crystalline Silica Warnings

Details hazards and handling of components containing Crystalline Silica.

Functionality of Main Parts

Appliance Location Requirements

Installation Site Warnings

Critical warnings regarding water damage and proper site selection.

Wall Mounting Procedures

General Venting Requirements

Venting System Warnings

Crucial warnings about common venting and air intake contamination.

Concentric Vent System Installation

General Installation Instructions

Guidelines for examining components and ensuring proper joint assembly.

Concentric Vent Installation Details

Cut-able Vent Installation

Wall Terminal Vent Installation

Wall Terminal Installation Procedure

Guidelines for installing vent systems through walls, including permits and checks.

Wall Termination Details

Roof Terminal Vent Installation

Roof Terminal Installation Procedure

Guidelines for installing vent systems through roofs, including permits and checks.

Roof Termination Details

Vent System Pre-Commissioning

Mandatory Pre-commissioning Procedure

Essential steps before initial system startup for plastic venting.

Venting Rules and Guidelines

Vent Termination Clearances

Termination Clearance Warnings

Critical warnings regarding safe distances for vent and air inlet terminations.

Common Venting System Procedures

Removal from Common Venting

Steps for safely removing an old boiler from a shared venting system.

Alternative Venting Options

PVC;CPVC;Polypro Single Pipe Requirements

Installation requirements for specific pipe materials in Canada.

Vent Length Calculations

Condensate Drain System

CH and DHW Circuit Installation

Gas Piping Installation

Gas Line Installation Requirements

Guidelines for sizing, connecting, and testing gas piping.

Gas Line Safety Warnings

Critical warnings regarding gas leaks, open flames, and pressure testing.

Electrical Connections

First Start-Up Safety Warnings

Electrical Connection Warnings

Warnings about improper electrical connections and their consequences.

Pre-Start Up Procedure Warnings

Warnings related to manual air bleed, venting, and general installation checks.

Appliance Start-Up Procedure

Safety Before Operation

Essential safety checks and procedures before initiating operation.

Operating Instructions

Comprehensive steps for starting the boiler and ensuring proper function.

Shutting Off Gas Supply

Procedure for safely turning off the gas supply to the appliance.

Filling and Venting the CH System

Filling the CH Section

Instructions for filling the central heating system and monitoring pressure.

Control Panel Operation

Parameter Setting Procedure

Step-by-step guide to accessing and adjusting boiler parameters.

Weather Dependent Control

Comfort Settings

Maximum Central Heating Temperature

How to adjust the maximum temperature setting for central heating.

Hot Water Comfort Settings

Options for setting hot water comfort levels: Eco, Comfort, Ecomfort.

System Venting

Appliance Calibration

Manual Calibration Procedure

Step-by-step guide for manual calibration using a flue gas analyzer.

Calibration Warnings

Critical warnings regarding the completion of the calibration process.

Calibration and Service Operations

Automatic Calibration

Procedure for automatic boiler calibration without external analysis.

Installation Checklist

Installation Completion Checks

Verification steps after installing piping, drains, and electrical connections.

Start-Up and Operational Checks

Final checks for gas leaks, water pressure, and smooth operation.

Pre-Departure Checks

Tasks to perform before leaving the installation site, including documentation.

Annual Maintenance and Inspection

Annual Inspection Checklist

Comprehensive checklist for yearly maintenance and inspection of the appliance.

Handling Refractory Ceramic Fibers

Crystalline Silica Safety

Warnings and information regarding potential hazards of Crystalline Silica.

Troubleshooting Guide

Servicing Precautions

Safety measures to follow when servicing the appliance.

Fault Codes and Reset Procedures

Start-Up Checklist

Light-Up Activities Verification

Checklist for verifying piping, pressurization, gas, condensate, calibration, and settings.

Periodic Maintenance Checklist

Inspection Activities

Table outlining routine inspection tasks for safe and efficient operation.

EcoKing C100 Specifications

General IconGeneral
BrandEcoKing
ModelC100
CategoryBoiler
LanguageEnglish

Related product manuals