EasyManua.ls Logo

EcoKing H200 - User Manual

Default Icon
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
EcoKing Supreme
high efficiency wall boiler
Installation Manual
2015
For Model numbers:
C100, C140, C200
H100, H140, H200
Installation
Service and maintenance
Start up
Parts
WARNING: If the information in this manual is
not followed exactly, a fire or explosion may
result causing property damage, personal injury
or loss of life.
WHAT TO DO IF YOU SMELL GAS:
Switch off the appliance.
Shut off the gas supply.
Open the windows.
Do not try to light any appliance.
Do not touch any electric switch.
Do not use any phone in your building.
Leave the house.
Immediately call your gas supplier from a
neighbour’s phone. Follow the gas
supplier's instructions.
If you cannot reach your gas supplier,
call the fire department.
WHAT TO DO IF YOU SMELL FLUE
GASSES:
Switch off the appliance.
Open the windows.
Shut off the gas supply.
Leave the house.
Contact a registered installer or
a registered service center.

Table of Contents

Questions and Answers

Summary

Introduction and Safety

Hazard Definitions and Warning Symbols

Defines hazard symbols, warnings, and safety notices.

Safety and Operating Instructions

Covers crucial safety warnings, gas/flue gas procedures, and initial operation steps.

Additional Safety and Compliance Warnings

Details warnings about silica, warranty voiding, and regulatory compliance.

Appliance Installation

General Venting Requirements and Contamination Avoidance

Introduces direct venting, combustion air intake, and sources of contamination.

Further Venting Options and Condensate

Common Venting Warnings and Removal Procedures

Alerts against common venting and provides steps for removing an existing boiler.

Central Heating (CH) and Domestic Hot Water (DHW) Circuit

Installing Gas Piping

Gas Piping Installation and Connection

Detailed instructions for safely installing and connecting the gas supply line.

First Start-up and Calibration

First Start-up Safety Precautions

Critical warnings and mandatory safety steps before initial operation.

Operating Instructions for First Start-up

Step-by-step guide to lighting the appliance safely and correctly.

Filling and Refilling the CH Section

Procedure for adding water to the heating system and checking pressure.

Boiler Calibration Procedures

Instructions for performing manual and automatic calibration for optimal performance.

Installation Check List

Comprehensive Installation Checklist

A detailed list of all steps to verify during appliance installation.

Annual Maintenance and Inspection

Annual Inspection Checklist

Guidelines and tasks for performing routine annual maintenance and inspection.

Troubleshooting

Fault Display, History, and Reset Procedures

How to interpret error codes, view fault history, and reset system errors.

Fault Code and Comfort Complaint Tables

Reference tables for error codes and common comfort-related issues.

Start Up Checklist

Final Start Up Checklist

A comprehensive list of final checks before and during initial appliance operation.

Maintenance Checklist

Periodic Maintenance Schedule

Recommends routine maintenance activities and provides a schedule for them.

EcoKing H200 Specifications

General IconGeneral
BrandEcoKing
ModelH200
CategoryBoiler
LanguageEnglish

Related product manuals