TOOLS AND PARTS REQUIRED FOR INSTALLATION
Your ECOLAB system will include an installation kit comprising of the
following items:
Description Qty
Strainer clear bowl with 20 mesh
PVC union S EPDM w/o
O-ring Sch. 80 threaded
Polypropylene valve, speed fit
Additionally you will need the following items, not included, to complete
the installation:
•
Polypropylene tubing
•
Flex PVC tubing
•
Wall anchors
•
Disconnect box, fuse box, conduit, wiring and related material to supply 220v to systems
(220v systems only)
The following tools will be required to complete the installation:
Power Tools Drill Bits
Drill Hole saw
Hammer Drill Paddle bit
Steel bit drill set
Mason bit
Hand Tools Taps
Set of sockets 2.5cm
Hammer 0.9cm
Screw Drivers – Flat & Phillips
Wire Strippers
PVC Cutters Hand Tools cont..
24” Level Tape Measure
Slip joint pliers Teflon Tape
Crescent wrench Allen Wrenches
True RMS Clamp Meter
Wire Cutters