EasyManua.ls Logo

Eden Madrid User Manual

Eden Madrid
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at
1 800 282 9346, ext #20
(Mon. to Fri. 8:00 AM to 4:00 PM EST).
1. Arch System & Spokes (1)
2. Post Caps (2)
3.
Pre-Assembled Lattice Screen
(1)
4. Ground Anchoring Stakes (2)
5. Hardware (in plastic bag)
a) 5/8” Self-Auguring Stainless Steel Screws (8)
b) #2 Robertson Drill Bit (1)
Tools You Will Need
• Cordless Drill
• Hammer
• Tape Measure
• Level
• Shovel
General Information
Read Instructions through carefully before beginning assembly.
• When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
• We recommend an area approx 5’x 8’ for unobstructed assembling.
• You should not need to use excessive force when assembling components.
The Madrid Trellis
Please read through before starting assembly.
ASSEMBLY INSTRUCTIONS
1
www.edenarbors.com
1
(Pre-Assembled)
5
a
b
Not to Scale
4
57.85
4
41.65
21.27
24.27
2
3
Question and Answer IconNeed help?

Do you have a question about the Eden Madrid and is the answer not in the manual?

Eden Madrid Specifications

General IconGeneral
BrandEden
ModelMadrid
CategoryLawn and Garden Equipment
LanguageEnglish

Summary

Check Box for Contents

Tools You Will Need

General Information

STEP ONE Assemble Trellis

Install Post Caps

Install post caps by pushing them down firmly until they lock into place.

Attach Arch System

Guide the arch system spokes into the trellis top rail holes and into post caps.

Secure Arch System

Push down firmly on the arch system to ensure it locks into the post caps.

STEP TWO Install Ground Anchor Stakes

Install Ground Anchors

Insert ground anchoring stakes into the bottom of the trellis posts and secure with screws.

STEP THREE Install Trellis into Ground

Position and Excavate Holes

Move trellis to final location, mark posts, excavate two 18" deep x 6" diameter holes.

Level Trellis in Ground

Place trellis in excavated holes and ensure it is level both vertically and horizontally.

Backfill Holes

Backfill the excavated post holes with the soil that was removed.

Related product manuals