EasyManua.ls Logo

EF EVO 45 - Maintenance Schedule

Default Icon
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ef cooling Ernst H. Furrer AG Operating manual
8-26 Chapter page Issue: 07 / 2015 Cooling unit EVO 45, 0390.013
Carefully clean the condenser with compressed air.
Note
The aluminium fins are razor-thin and must not be bent as otherwise proper functioning
is no longer ensured.
8.2.4 Water-cooled cooling units
- Check fresh water supply to the cooling unit.
- Check recooling system
8.3 Maintenance schedule
Work required
weekly
monthly
annually
Air-cooled cooling units:
Check air filter mats for fouling,
clean or replace as required
Water-cooled cooling units:
Check water supply
X
Check medium filter for fouling,
clean or replace as required
X
Check tank level,
top up medium as required
X
Inspect medium lines for leaks and kinks
X
Inspect refrigerant circuit for refrigerant
leaks
(watch out for traces of refrigerant oil)
X
Tighten screw clamps in the control
cabinet and in the connection boxes of
electrical components
X
Check medium quality,
replace medium as required
X
Refill medium circuit / replace media
X

Table of Contents