EasyManuals Logo

EFD Ultra 2400 Quick Start Guide

EFD Ultra 2400
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Remove barrel holder sleeve from holder.
Loosen the 6 mm screw from T-nut.
Slide T-nut into left or right panel of workstation slot,
positioning as shown.
Tighten 6 mm screw, securing holder to
workstation panel.
Insert barrel holder sleeve.
Loosen screw from wire hose holder T-nut.
Slide T-nut into any workstation slot.
Tighten screw to secure wire hose holder to workstation.
Easy 14-Step Setup
Follow these steps to get your Ultra 2400
ready for operation.
®
A NORDSON COMPANY
Ultra
®
2400 Series
Dispensing Workstation
Connect the power plug to the power pack. The unit is shipped with a
USA-compatible plug and three international plugs. Attach the correct
plug to match local power outlets.
Connect the power cord into the back of the Ultra 2400.
Connect the power cord into your local power source.
Press the power switch on the front panel.
Power cord
1
2
3
6
7
8
5
4
Quick Start Guide
Unpack the unit.
Now is a good time to activate your extended Ten Year No-Fault Warranty.
Register the warranty online at www.efd-inc.com/warranty/ten.
Unpack the Unit/Warranty
1
Install Barrel Holder
2
Connect Power
3
1
Electronic pdf files of EFD manuals are also available at www.efd-inc.com/manuals.html

Other manuals for EFD Ultra 2400

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EFD Ultra 2400 and is the answer not in the manual?

EFD Ultra 2400 Specifications

General IconGeneral
Model2400
SeriesUltra
Operating Pressure10-100 psi
Material CompatibilityWide range of fluids including adhesives, lubricants
Nozzle OptionsVarious sizes and materials available
Control InterfaceDigital

Related product manuals