EasyManua.ls Logo

EFD Ultra 2400 - Quick Start Guide Manual

EFD Ultra 2400
4 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
• Remove barrel holder sleeve from holder. ❶
• Loosen the 6 mm screw from T-nut. ❷
• Slide T-nut into left or right panel of workstation slot,
positioning as shown. ❸
• Tighten 6 mm screw, securing holder to
workstation panel. ❹
• Insert barrel holder sleeve. ❺
• Loosen screw from wire hose holder T-nut. ❻
• Slide T-nut into any workstation slot. ❼
• Tighten screw to secure wire hose holder to workstation. ❽
Easy 14-Step Setup
Follow these steps to get your Ultra 2400
ready for operation.
®
A NORDSON COMPANY
Ultra
®
2400 Series
Dispensing Workstation
• Connect the power plug to the power pack. The unit is shipped with a
USA-compatible plug and three international plugs. Attach the correct
plug to match local power outlets.
• Connect the power cord into the back of the Ultra 2400.
• Connect the power cord into your local power source.
• Press the power switch on the front panel.
Power cord
1
2
3
6
7
8
5
4
❶
❷
❸
❹
❽
❺
❼
❻
Quick Start Guide
• Unpack the unit.
• Now is a good time to activate your extended Ten Year No-Fault Warranty.
Register the warranty online at www.efd-inc.com/warranty/ten.
Unpack the Unit/Warranty
1
Install Barrel Holder
2
Connect Power
3
1
Electronic pdf files of EFD manuals are also available at www.efd-inc.com/manuals.html