EasyManua.ls Logo

EFT Z Series - Pre-flight Preparation; Inspection; Smart Battery

EFT Z Series
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
①Motor set
②Arm
(
Φ50mm
)
③Landing gear
④Spraying tank
⑤Centrifugal nozzle
⑥Cabin
⑦Front cover
⑧Camera
⑨Rear cover
⑩Landing gear crossbar
⑪Arm buckle
⑫Radar
⑬Antenna
⑭RTK
⑮Flight control
⑯Receiver
⑰Level gauge
⑱Impeller pump
⑲Ultrasonic flow meter
Pre-flight Preparation
Inspection
Check whether the components are in good condition, especially the landing gear , the
internal flight control and flow meter interface etc..
Check the identification on the motors and propellers to ensure that the installation order is
correct (CW—M2/M4, CCW—M1/M3).
Check that all pins are not skewed and that the cables are properly connected.
Check whether the arm and cover is locked, and whether the nozzle is installed firmly.
After a overall inspection, level the motors, then unfold paddles and ready for testing.
Smart Battery
Installation
The smart battery can be installed directly, insert battery until hearing a clicking sound, then lock