EasyManua.ls Logo

EIK AM200 - Landing from Open Water

Default Icon
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.eikengineering.com
Choose a land with slope approximately 10° or less continues down to the the water
until the machine can floats. Prepare the slope if there is no such landscape at your
site.
Lower the front attachment to create a low centre of gravity for the machine which
could stabilze the machine during launching.
Launch the machine tailforemost at a slow speed. Refer to the arrow direction at the
pontoon before launching.
Figure 1.12
1.9 Landing the Machine from Open Water
Lower the front attachment once the front track catches the land during landing. If the track
slips during landing, use the bucket to help your machine escape from water.
Ensure that the front machine is facing to the land during landing.
Figure 1.13
7

Related product manuals