EasyManua.ls Logo

EIUK PTB 600 - Preparation of Operation; Installation; Removal of Packaging; Positioning the Calibrator

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PTB600-MAN-V10.4 PTB 600 Instruction Manual
10
5 - PREPARATION OF OPERATION
Remove the calibrator from the packaging (5.1.1) and place it on a flat surface (5.1.2).
Make sure that the instrument has been correctly earthen.
Supply the oven with line 230V, 50Hz + earth (5.1.3).
Insert the equalising block into the furnace: reference at the instruction on paragraph 5.1.4
Before start the calibration read with attention the instruction manual, specially the paragraph 3: -
General recommendation.
5.1 - Installation
5.1.1 - Removal of packaging
The calibrator is equipped with packaging suitable for transport and traditional shipping systems. Any
damage caused during transport must be notified immediately to the carrier and a claim must be made.
5.1.2 - Positioning the calibrator
Position the calibrator in a safe clean place; leave enough space around the calibrator to allow the air to
circulate well.
**DANGER: The calibrator is suitable for operating at high temperatures with the consequent danger of
fire. Keep it away from any type of inflammable materials and, never put any type of liquid
inside the block (reference to paragraph 4)
*
WARNING: To avoid any smell in the room it is better to switch on the calibrator outside the room for the
first time
5.1.3 - Supply
The calibrator runs on a voltage of 230 Vac (115V by request), 50/60Hz.
A 2.5mt. cable is supplied with the calibrator fitted with 2 conductors plus earth.
Make sure that the plant is earthen correctly before switching the instrument on.