Setting Up
User Manual Biosen C_line Clinic / GP+
5.2 Preparations for device operation
5.2.1 Consumables
The following consumables are needed:
Pour system solution into the bottle (see Section 3 (19), page 7)
and place in the appropriate opening.
Place the empty waste bottle (see Section 3 (18), page 7) in the
appropriate opening.
Chip sensors for glucose and / or lactate measurement
Pre-filled micro test tubes for sampling
Micro test tubes with calibration solution (standard)
5.2.2 Pump tube
The device is delivered with a pump tube which is hung externally, in
order to avoid the tube becoming stuck when at rest. For initial start-up
the pump tube must be hung on.
State on delivery
Open pump flap (raise up from
right to left).
Figure 3 – Pump tube hung externally
The pump tube must be hung on
and centered on the pump rollers.
A rounded pair of tweezers is
recommended for this. Do not use
sharp objects.
Then close the pump flap from left
to right.
Figure 4 – hanging on pump tube