EasyManua.ls Logo

Elite Screens AEON series - Support Bar Installation (Models < 135); Support Bar Installation (Models Under 135); Support Bar Installation (Models 135-150)

Elite Screens AEON series
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev.04/17/2017 DR www.elitescreens.com 7
Support bar installation (for models under 135”):
1. Position the center support bar (E) in the middle of the frame and align the hole on each end of the support bar
with the M6 hex screws on the top and bottom frames. Then fasten with the M6x12 screws.
Support bar installation (for models 135”- 150"):
1. Position the center support bar (E) and M6 hex screws in the areas of the frame shown in fig 1. (Each about one
thirds the way in from the end of the frame.) Align the hole on each end of the support bar with the M6 hex screws
located at the top and bottom frame
sections. Then fasten with the M6x12
screws.
Move the
M6 hex screw
to the middle area of the frames.
Align the M6 screws
with the two holes.
Center Support bar
Center Support Bar
Move the M6 hex screw to these areas of the frame.

Related product manuals