P 2500 - P 500
2
Drawing 6
1 Fastening point (10.45 x 7.99)
2 Fastening point, re-adjustable (9.06 x 7.09in)
3 Clearance for cable entry (empty conduits) (7.87 x 5.75in)
4 Drilling template
5 Foundation
6 Direction roadway
WARNING!
Danger of injury by incorrect fixation of the barrier
housing on the foundation!
Loosening of the anchor bolts from the foundation.
ļ During the fastening of the barrier obey the minimum
distance of the heavy duty anchor to the edge of the
foundation.