1592025050 iProChill v2.5 10D00 AG v1.3 GB 18.02.2016.docx iProCHILL 136/205
Defrosting cycle start temperature setting together with circuit 4 after the
count of parameter dF09 elapses
End temperature setting of circuit 1 with defrost cycle
The actual defrost cycle on circuit 1 terminates when the temperature sensed
by the combined defrost temperature probe exceeds the dF14 limit.
End temperature setting of circuit 2 with defrost cycle
End temperature setting of circuit 3 with defrost cycle
End temperature setting of circuit 4 with defrost cycle
Forcing by switching ON activates all steps in defrosting mode in circuit 1
0 = disabled
1 = enabled
Forcing by switching ON activates all steps in defrosting mode in circuit 2
Forcing by switching ON activates all steps in defrosting mode in circuit 3
Forcing by switching ON activates all steps in defrosting mode in circuit 4
ON delay between two compressors in defrosting mode
Fan ON activation during defrosting/dripping
0 = disabled
1 = enabled only during defrost
2 = enabled during defrosting/dripping
Temperature/pressure setting that forces the fan ON in defrosting mode
Defrost with condensation fans
Defrost activation setting with condensation fans
The function defrost with outdoor fans is enabled if the external temperature
is above the dF25 level.
Defrosting cycle start in unit
0 = independent
1 = if both have reached the request for defrosting to start
2 = if at least one has reached the request for defrosting to start
Defrosting cycle end in unit
0 = independent
1 = if both have reached the defrost end status
2 = if at least one has reached the defrost end status
Begin end defrost from analog input
Probe that determines the defrost start and end
0= start and end with condensation temperature / pressure probe
1= start with evaporation pressure probe - end with condensation
temperature / pressure probe
2= start with condensation temperature / pressure probe - end with
evaporation pressure probe
3= start and end by evaporation pressure
4=start and end by auxiliary probe 1
Minimum idle time before forced defrosting
The device wait the delay time dF29 before starting a forced defrost cycle
after the relevant conditions have reached
Forced defrosting temperature/pressure setting
Forced defrosting differential
Supply fan working in defrost mode
Supply fan block in defrosting mode
0 = Not enabled – Supply fan works during defrost
1 = Enabled – Supply fan doesn’t work during defrost
Anti-freeze security for multi circuit units
Forcing circuits that are not defrosting ON
0 –function is disabled
1 –function is enabled with the fan off
2 –function is enabled with fan controlled by HP circuit