Maintenance
Operations concerning the integral slam shut version are in italic.
Servicing Check
Recommended frequency:
• Twice yearly minimum
Verication:
• Set point verication
• Regulator valve plug tightness
• Tripping and set point value
• Slam shut valve tightness
Departure positions
• Inlet valve Open
• Outlet valve Open
• Slam shut valve plug Open
• Regulator In operation
Inlet and outlet sides of regulator under pressure
Tightshutverication(and tripping verication for
integral slam shut versions)
• Inlet valve Closed
• Outlet valve Closed
• Regulator Observe the evolution of the outlet
pressure (control regulator tightness)
Filterverication
• Purge the lter C
• Verify the cartridge
If the outlet pressure increases Internal leak
Control the regulator valve plug
Control the regulator orice
Control the pilot or contact after-sales
If the outlet pressure decreases External leak
Locate and seal the leak or contact after-sales
If the outlet pressure is constant The regulator is tightshut
Increase the set point until tripping occurs
(without exceeding the outlet limits)
If the slam shut valve plug will not close Operating fault
Control the release relay
Control the slam shut valve plug or contact after-sales
If the slam shut valve plug closes Operating correctly
Observe the evolution of the outlet pressure (control tightness)
If the outlet pressure is constant
Purge the outlet side of the regulator
Observe the evolution of the outlet pressure (control tightness)
If the outlet pressure increases Internal leak
Control the slam shut valve plug
Control the slam shut orice
Control the bypass or contact after-sales
If the outlet pressure is constant Slam shut valve plug is tightshut
Table 12. Troubleshooting for Types EZR and EZR-OS2 Regulators