EasyManua.ls Logo

Emerson FloBoss 107 - Page 25

Emerson FloBoss 107
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Site Considerations for Equipment Installation, Grounding, and Wiring Manual
D301452X012
October 2019
Lightning Arresters and Surge Protectors 21
H.
Only connect the antenna cable to the radio after the mast has been properly grounded
and the lead-in cable has been properly connected to lightning arresters which in turn have
each been properly connected to a known good earth ground.
Figure 4-2: Radio Antenna Field Installation Site Grounding

Table of Contents

Other manuals for Emerson FloBoss 107

Related product manuals