EasyManuals Logo

enphase IQ8P-3P-72-E-US User Manual

enphase IQ8P-3P-72-E-US
75 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #49 background imageLoading...
Page #49 background image
IQ8 Commercial Microinverter grid-tied PV system
49 © 2023 Enphase Energy Inc. All rights reserved. November 2023
USG-00026-1.0
Step 5: Configure Production and Consumption CTs using the meter wizard
A. Verify that the configuration matches what is installed (solar + load or load only).
B. Enable the meters by verifying the readings by going through the meter wizard (required).
C. While in the production meter wizard, switch OFF the PV breakers as instructed to make sure
the readings go to zero before enabling.
D. While in the consumption meter wizard, turn ON the PV and a known load in the home to
confirm consumption rises as expected, and select the meter location (solar + load)s.
E. To commission the CTs, see How do I use the meter wizard in the
Enphase Installer App to
configure production and consumption CTs?.

Table of Contents

Other manuals for enphase IQ8P-3P-72-E-US

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the enphase IQ8P-3P-72-E-US and is the answer not in the manual?

enphase IQ8P-3P-72-E-US Specifications

General IconGeneral
Brandenphase
ModelIQ8P-3P-72-E-US
CategoryInverter
LanguageEnglish

Related product manuals