Perform the following operations and checks every 6 months according to intensity of use of the
automation.
Disconnect the 230 V~ power supply and batteries (if fitted) and release the gearmotor:
- Visually check that the gate, the fixing brackets and existing structure have suitable mechanical
strength and are in good condition.
- Check the gate-gearmotor alignment, the distance (2-3 mm) between the groove of the pinion
and the crest of the rack.
- Clean the wheel's sliding guide, the rack and pinion of the gearmotor and slightly lubricate
the rack and pinion. Manually check that the gate slides evenly and without friction.
Connect the 230 V~ power supply and batteries (if fitted) and lock the gearmotor:
- Make sure the limit switches are working correctly.
- Check the power adjustment.
- Check that all control and safety functions are working correctly.
N.B.: For spare parts, see the spares price list.