EasyManua.ls Logo

EOS P96 - Page 4

EOS P96
161 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Doc:
Issue
Date
Page
VLT-MAN-ESO-14650-4942
P96
24.06.2015
4 of 161
ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany
25.08.2010
26.08.2010
All
CMa, sections 2.4.7 and
2.4.8, 2.4.9, 4.4, 4.7, 4.8
added. Sections 2.2.1, 3.2,
4.5.2, 4.6, 5.1.1, 5.1.2
modified. Figure added in
5.1.1, Table 11 updated, old
Table 3 removed. + modified
structure of the sections
27.02.2011
01.03.2011
03.03.2011
07.03.2011
28.03.2011
20.06.2011
Modified sects. 1.3, 2.2.1.3,
2.2.4.2, 2.3.2, 2.4, 2.4.3,
2.4.4, 2.4.6.1, 2.4.7, 3, 3.2,
3.3.1, 3.3.2, 3.3.3, 3.3.4,
4.1.1, 5, 5.1, 5.6.1, 5.6.2,
5.7, 5.9, 6.1.3, 6.2.3
New Sects 2.4.10, 2.4.11,
2.4.12, 2.4.13, 2.4.13,
2.4.14, 3.4, 3.4.1, 3.4.2,
3.4.3, 3.4.4, 3.4.5, 3.4.6
Modified tables: 2, 7, 11, 12,
66
New tables: 10, 13
Modified figures: 10, 15
New figures: 5, 11
New subsections 2.4.6, 6.1.3
CMa,
update wrt
the performances,
new identified problems
and status + description of
the current ones.
New items in the FAQ,
new calibration plan,
new section about the
observation strategy.
Figures updated to be more
clear and useful.
NIR 1.5” slit removed.
Intervention of July 2011
briefly described
+additional corrections of
figures and sections
according to IOT comments.
Very minor changes.
New templates added +
minor corrections
04.08.2011
30.11.2011
Modified Sections: 2.1,
2.2.1.4, 2.2.4.2, 2.2.4.5,
2.3.2, 2.4.6, 2.4.9, 2.4.13,
2.4.15, 3.4.1, 5.1, 5.5, 5.7,
6.1.5, 6.2.3.
New sections: 2.2.4.3, 2.4.7
Modified tables: 1, 9, 12, 13,
16, 72
New tables: 3, 4, 10
CMa, major modifications wrt
the new slits in the NIR +
new slits with K-band
blocking filter added and
background performances +
the new TCCD
performances + the new
calibration plan + correction
of typos and clarification of
different points (attached
calibrations, known
problems, etc), weblinks
modified.
Modifications regarding
phase2 + changes for the
acquisition+setup+readout+
wiping overheads.
+ additional information
regarding integration times
for the TCCD.

Table of Contents