Before installation
1. Minimum static water pressure: 0.08+MPa (8.5L+L/min), failure to meet this
pressure will not achieve the best flushing effect.
Note: Apply the methods below if you don't have water pressure testing device.
Open the angle valve to check the water volume. If the water volume after 10
seconds is greater than 1.42L, then it is OK to proceed installation.
10 Sec
2. Installation of power switch.
250
Note:
1. Please install the power switch in
accordance with the circuit breaker
instruction after the power is turned off
(Circuit breaker not supplied).
2. The ground wire should be 5mm longer
than neutral wire and live wire.
3. white: neutral wire
black: live wire
green: ground wire.