07
After installation
Water & Electricity pre-installation dimensions
Pre-installation confirmation (Unit: mm)
Circuit pre-installation: Install a fixed electrical supply circuit (Neutral wire,
live wire and ground wire included.)
· Confirm the electrical connection location.
· Reserve pipeline for electrical circuit
Circuit breaker pre-installation
· Connect a separate upstream circuit breaker.
· Pre-connect an earth leakage circuit breaker or grounding protector for other independent
circuits.
Waterway pre-installation
· Reserve pipeline for water supply hose.
Note:
This circuit must have a leakage
protection function and can be
shut down separately.
212
180
500
500
58.5