EasyManua.ls Logo

EPLO EP-W20 - Pre-installation Confirmation; Circuit Pre-installation; Circuit Breaker Pre-installation; Waterway Pre-installation

EPLO EP-W20
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
07
After installation
Water & Electricity pre-installation dimensions
Pre-installation confirmation (Unit: mm)
Circuit pre-installation: Install a fixed electrical supply circuit (Neutral wire,
live wire and ground wire included.)
· Confirm the electrical connection location.
· Reserve pipeline for electrical circuit
Circuit breaker pre-installation
· Connect a separate upstream circuit breaker.
· Pre-connect an earth leakage circuit breaker or grounding protector for other independent
circuits.
Waterway pre-installation
· Reserve pipeline for water supply hose.
Note:
This circuit must have a leakage
protection function and can be
shut down separately.
212
180
500
500
58.5

Related product manuals